Skip to Content

Gallery

Work Scope

Client: The Egyptian French Joint Venture For Civil Works

Install firefighting systems for Cairo Metro Line 3 - Phase 4A, covering four stations and tunnels.

Completion Status:  Completed in 2019

The project emphasizes the installation of firefighting systems specifically designed for the metro stations and tunnels within this phase of the Cairo Metro Line 3 expansion.